Intervention summaryProject 2 – “Fontane Marzare” includes 5 resurgence systems: CR35, CR36, CR37, CR38, CR39. These have been treated, from the point of view of the interventions, as a single project.
The interventions included actions aimed at maintenance, with ordinary management with mowing of the grass once a year and small interventions of rearrangement of the bottom and banks and redevelopment of the foreman and the shaft downstream of the foreman. Reopening with flattening of the ground up to the interception of the resurgence point was also foreseen.
Works implemented: Reshaping of head 1, reopening of the head and initial section of the shaft, bamboo eradication, arrangement of landslides, reshaping of head 2, sediment removal and re-profiling of the riverbed, creation of a puddle for amphibian reproduction.
Deviations from original plans / relevant notes: none
Intervention official documentation (in Italian). • TAVOLA PROGETTO • RELAZIONE TECNICA • RELAZIONE PAESAGGISTICA • VALUTAZIONE DI INCIDENZA • REPORT INTERVENTO