IRRIGATION DITCH CASTELLARO
Intervention summaryProject 9 “Roggia Castellaro” includes 1 resurgence systems: CR17-CR18.
The interventions consisted of actions aimed at maintenance, which provided for ordinary management with mowing of the grass once a year and small interventions to refurbish the bottom and banks and environmental requalification of the resurgence area and the river. Construction of structures to favour the use of the Castellaro resurgence by people for tourist / educational purposes was also foreseen.
Works implemented: Construction of the 1st floor bridge, sediment removal and re-profiling of the riverbed, construction of the 2nd floor bridge, positioning of stones and boulders, construction of a pedestrian path and head re-profiling.
Deviations from original plans / relevant notes: none