IRRIGATION DITCH TERGOLA SUD
Intervention summaryProject 1 “Roggia Tergola” includes 3 resurgence systems: CR40, CR41-CR42, CR43. These have been treated, from the point of view of the interventions, as a single project.
The interventions consisted of actions aimed at maintenance, with ordinary management with mowing of the grass once a year, plus small interventions of rearrangement of the bottom and banks, purging interventions aimed at removing the sediments from the bottom, redevelopment of the foreman and the shaft downstream of the foreman, interventions on the banks.
Works implemented: Bank re-profiling, slope softening, head reshaping and arrangement of the target species reproduction island, opening of the puddle for amphibian reproduction, arrangement of the existing isthmus.
Deviations from original plans / relevant notes: none