SOURCES OF TERGOLA
Intervention summaryProject 11 “Sorgenti del Tergola” includes 2 resurgence systems, for a total of 5 “capofonti”: CR1-CR2-CR3-CR4, CR5. These have been treated, from the point of view of the interventions, as a single project.
The interventions consisted of actions aimed at maintenance, which provided for ordinary management with mowing of the grass once a year and small adjustments to the bottom and banks, plus the redevelopment of the shaft downstream of the foreman for the first 100 meters.
Works implemented: Sediment removal and riverbed re-profiling, stones and boulders laying, positioning of 2 constrictors.
Deviations from original plans / relevant notes: During works in this area, following information extemporaneously received from local citizens, it was possible to localize and to bring to light an old spring that was occupied by a parking lot. This activity was not originally foreseen in the project, but represent an important result from environmental point of view.
Intervention official documentation (in Italian). • TAVOLA DI PROGETTO • RELAZIONE TECNICA • RELAZIONE PAESAGGISTICA • VALUTAZIONE DI INCIDENZA • REPORT INTERVENTO